基于模糊层次分析的地铁车站PBA工法施工风险分析与控制 被引量:1

Analysis and Control of Construction Risk by PBA to Metro Station Based on Fuzzy Analytic Hierarchy Process
下载PDF
导出
摘要 石家庄地铁3号线一期工程中的三教堂站暗挖段采用PBA工法施工,具有埋深浅、水文地质条件差、下穿既有环路及管线等工程特点,施工风险系数较高。文章以该车站为工程依托,采用模糊层次分析法对地铁车站采用PBA工法施工存在的各类风险因素进行了分析与评估,并提出针对性的风险防范控制措施,不仅保证施工安全可控,还为管理人员对风险进行差异化管控提供了参考和借鉴。 This paper is rely on the Sanjiaotang Station., which is one of the Shijiazhuang Metro Line 3.Undercut Section of Station has many shortcomings, such as shallow depth, poor hydrogeological conditions,down through existing circumcity highway and pipelines and so on. So the risk of construction is high. Fuzzy analytical hierarchy process can be aimed at risk of the station to analysis and evaluation. This research method obtains the importance ranking of various risk factors, and we can put forward corresponding risk control measures, so that it provides the basis for risk control and decision-making for managers. Practice has proved that: the paper’s risk analysis is reasonable and control measures are effective, which can provide reference for similar projects.
作者 吴涛 魏鑫 仲其文 施烨辉 常庆海 张利强 WU Tao;WEI Xin;ZHONG Qi-wen;SHI Ye-hui;CHANG Qing-hai;ZHANG Li-qiang(Kentop Civil Engineering Co.,Ltd,Nanjing Jiangsu 210041 China;NO.1 Geological Brigade of Jiangsu Bureau of Geology and Mineral Resources,Nanjing Jiangsu 210041 China;Geology Tunnel and Undergrand Engineering Technology Co.,Ltd of Jiangsu Province,Nanjing Jiangsu 210041 China)
出处 《江苏建筑》 2021年第1期86-89,共4页 Jiangsu Construction
关键词 PBA工法车站 模糊层次分析 风险因素 重要度排序 施工管控 PBA method—Metro station fuzzy analytic hierarchy process risk factors importance ranking management and control of construction
  • 相关文献

参考文献8

二级参考文献29

共引文献57

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部