期刊文献+

乌鲁木齐地铁1号线列车开行方案研究 被引量:1

Study on train operation plan of Urumqi Metro Line 1
下载PDF
导出
摘要 根据乌鲁木齐地铁1号线路特点及初期预测的客流分布特征,从乘客出行成本与运营成本两个方面考虑,以列车行车间隔与满载率为约束条件,建立了非线性双目标整数规划模型。采用线性加权法对目标函数优化并进行了求解算法的设计。结合初期预测客流对乌鲁木齐地铁1号线进行了开行方案的求解,得出的列车开行方案明显优于现行方案。 Based on the characteristics of Urumqi Metro Line 1 and the characteristics of passenger flow distribution predicted in the initial stage,the nonlinear two-objective integer programming model is established from the perspectives of passenger travel cost and operation cost,with train interval and full load rate as constraints.The linear weighting method is used to optimize the objective function and the algorithm is designed.Based on the preliminary passenger flow forecast,the running plan of Urumqi Metro Line 1 is solved,and the train running plan is obviously better than the current one.
作者 安志龙 马丽 安志学 Zhilong An;Li Ma;Zhixue An(Shaanxi Railway Institute,Weinan 714000,China;China Railway Hohhot Group Co.,Ltd,Hohhot 010050,China)
出处 《青海交通科技》 2020年第6期37-40,43,共5页 Qinghai Transportation Science and Technology
基金 陕西铁路工程职业技术学院研究生专项资助项目(Ky2018-63)。
关键词 乌鲁木齐地铁 开行方案 出行成本 运营成本 双目标整数规划模型 Urumqi subway operation plan travel costs operating costs two-objective integer programming model
  • 相关文献

参考文献8

二级参考文献47

共引文献180

同被引文献8

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部