浅埋暗挖隧道下穿既有构造物施工技术 被引量:2

Construction Technology for Shallow Overburden Tunnel Under-crossing Existing Structures
下载PDF
导出
摘要 在浅埋暗挖隧道下穿既有构造物施工过程中,隧道的开挖极易引起地表及构造物的沉降变形,给隧道施工带来极高的安全隐患。以龙泉山隧道下穿张万沟大桥工程为例,鉴于张万沟大桥桩基础底与龙泉山隧道顶间距较小,在不采用一定的加固技术条件的前提下直接采用常规爆破开挖支护施工将致使建筑物产生附加应力和变形[1],从而影响建筑物的正常使用和安全,因此,隧道在下穿过程前必须采用预先加固措施。介绍了该工程通过地震波反射法超前地质预报,采用超前帷幕注浆、大管棚双重预加固,实施上下台阶光面爆破施工技术有效控制了地表及隧道拱顶沉降的全过程,所取得经验可为类似工程提供参考。 Excavation of shallow overburden tunnels under-crossing existing structures can easily cause settlement and deformation of ground surface and the structures,which leaves great safety hazards to tunnel construction.Longquanshan Tunnel under-crosses Zhangwangou Bridge,and the distance between pile foundation of Zhangwangou Bridge and the top of the tunnel is relatively small.Additional stress and deformation on the structures occur when conventional blasting excavation and support method is applied without taking reinforcement measures,then safe and normal operation of the structures will be disturbed,so the structures must be pre-reinforced before excavation starts.This paper introduces how the settlement of the surface and tunnel arch is effectively controlled on Longquanshan Tunnel which under-crosses Zhangwangou Bridge applying seismic reflection geological forecasting method,advanced curtain slurry,large pipe shed pre-reinforcement measures,as well as upper and lower step smooth blasting method.The experiences obtained provides reference for similar projects.
作者 李新生 孙慕楠 LI Xinsheng;SUN Munan(PLA Troop 95338,Guangzhou,Guangdong,510000;First Branch of Sinohydro Bureau 7 Co.,LTD,Pengshan,Sichuan,620860)
出处 《四川水力发电》 2021年第1期35-38,共4页 Sichuan Hydropower
关键词 龙泉山隧道 浅埋暗挖 地震波反射法 帷幕注浆 大管棚 光面爆破 Longquanshan Tunnel shallow overburden excavation seismic reflection method curtain slurry large pipe shed smooth blasting
  • 相关文献

参考文献4

二级参考文献19

  • 1张惠平.城市地下工程建设中的环境工程地质问题——预防与控制[J].自然灾害学报,2005,14(4):146-149. 被引量:25
  • 2GB50157-2003.地铁设计规范[S].[S].,..
  • 3.建筑变形测量规程[S].[S].建设部综合勘察研究设计院,北京:中国建筑工业出版社,1998..
  • 4南京地铁1号线南延安德门-宁丹路区间施工图[Z].兰州:中铁第一勘测设计院,2007.
  • 5复杂工程环境下隧道施工洞室稳定及结构检算报告[R].石家庄:石家庄铁道学院,2007.
  • 6SHARMA J S,HEFNY A M,ZHAO J,et al. Effect of large excavation on deformation of adjacent MRT tunnels[J], tunneling and underground space technology, 2001, 16(2): 93-98.
  • 7ATTEWELL P B YEATES J.SELBY A R .soil movement induced by tunneling and their effects on pipelines and structures[M]. New York Chapman and ha11,1986:151-179.
  • 8SHIN H S KIM C Y KIM K Yet al. A new strategy for monitoring of adjacent structures to tunnel construction in urban area [J]. Tunneling and Underground Space Technology ,2006, 21(5):461-462.
  • 9JGJ125—1999,危险房屋鉴定标准[s].
  • 10钱七虎,戎晓力.中国地下工程安全风险管理的现状、问题及相关建议[J].岩石力学与工程学报,2008,27(4):649-655. 被引量:326

共引文献42

同被引文献6

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部