瀑布沟及下游泥沙优化调度实施与效果分析

Study on Practice and Performance of Optimized SedimentScheduling over Pubugou and Downstream Reservoirs
下载PDF
导出
摘要 通过建立一维水沙数学模型,分析不同水位和流量级下瀑布沟-龚嘴-铜街子联合调度方案排沙效果。结果表明:利用瀑布沟-龚嘴-铜街子三库联合调度造峰排沙效果优于龚、铜两库独立调度排沙。适当抬高库区运行水位有助于提高发电效益,降低运行水位有助于提高排沙效果。从兼顾梯级水库联合排沙效果,适当提高龚、铜运行水位的经济运行方面综合考虑,采取龚、铜两库优化方案2联合瀑布沟水库造峰4500 m^(3)/s的排沙方案效果最为适宜。 Through establishing one-dimensional mathematical model for water and sediment,this paper analyzes sediment removal performance of joint scheduling scheme of Pubugou-Gongzui-Tongjiezi reservoirs under different water and flow levels.The study shows that joint scheduling of Pubugou-Gongzui-Tongjiezi reservoirs is better than independent scheduling schemes of Gongzui and Tongjiezi reservoirs.Appropriate raising of operating water level of reservoir improves generation efficiency,and lowering operating water level improves the sediment removal performance.Taking into account joint sediment removal performance of cascade reservoir and economic operation owning to appropriate increase of operating water level of Gongzui and Tongjiezi reservoirs,joint scheduling of the optimized sediment removal scheme No.2 of Gongzui and Tongjiezi reservoirs and that of Pubugou reservoir when peaking 4500 m3/s is adopted.
作者 杨冬梅 熊灿林 张自航 YANG Dongmei;XIONG Canling;ZHANG Zihang(Dadu River Production Command Center,CHN Energy Co.,LTD,Chengdu,Sichuan,610041)
出处 《四川水力发电》 2021年第1期113-117,共5页 Sichuan Hydropower
关键词 瀑布沟 淤积现状 调度方案 排沙效果 Pubugou reservoir sedimentation situation scheduling scheme sediment removal performance
  • 相关文献

参考文献4

二级参考文献15

  • 1彭杨,李义天,张红武.汛末蓄水时间对三峡水库河道冲淤的影响[J].水动力学研究与进展(A辑),2004,19(6):817-822. 被引量:1
  • 2林一山.水库长期使用问题.人民长江,1978,(2).
  • 3唐日长.水库淤积调查报告.人民长江,1964,(3):8-14.
  • 4韩其为.水库淤积与观测(一)[R].长办外国实习生培训队,长江流域规划办公室,1971:134.
  • 5李义天.三峡水库汛后提前蓄水可行性研究[R].武汉大学.2007.
  • 6长江科学院.三峡工程175米方案水库泥沙数学模型计算成果分析[C]//三峡工程泥沙问题研究成果汇编,1988,6.
  • 7长江科学院.向家坝及溪洛渡水库修建后三峡水库淤积一维数模计算报告[C]//三峡工程泥沙问题研究成果汇编,1998,6:99-114.
  • 8中国水利水电科学研究院泥沙所.向家坝和溪洛渡水库对三峡水库泥沙淤积的影响[C]//三峡工程泥沙问题研究成果汇编,1998,6:99-114.
  • 9朱鉴远.控制泥沙淤积的主要措施──水库泥沙调度[J].四川水利,1997,18(3):6-10. 被引量:4
  • 10周建军,林秉南,张仁.三峡水库减淤增容调度方式研究——双汛限水位调度方案[J].水利学报,2000,31(10):1-11. 被引量:24

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部