50m铁路简支箱梁海中支架现浇施工技术

Cast-in-situ Construction Technology of 50m Railway Simply Supported Box Girder in Sea
下载PDF
导出
摘要 结合青岛至连云港铁路跨胶州湾特大桥施工实践,提出了将50m预应力混凝土简支箱梁由节段拼装变更为支架现浇施工,设计了海中浅水区简支箱梁现浇施工用的钢管立柱、贝雷梁支架方案,简要介绍了支架体系的设计、力学验算及主要施工要点等。 Combined with the construction practice of the Qingdao-Lianyungang Railway Crossing Jiaozhou Bay Bridge,it is proposed to change the 50m prestressed concrete simply supported box girder from segmental assembly to support cast-in-place construction.The steel pipe column and Bailey beam support scheme for the cast-in-situ simple box girder in the shallow water area of the sea is designed,and the design of the support system,mechanical check calculations and main construction points,etc.are briefly introduced.
作者 郭之起 GUO Zhi-qi(The No.3 Engineering Co.,Ltd.of China Railway 14th Bureau Group Corporation,Ji'nan 250300,China)
出处 《价值工程》 2021年第5期188-189,共2页 Value Engineering
关键词 浅水 海中支架 箱梁 现浇施工 shallow water support in sea box girder cast-in-situ construction
  • 相关文献

参考文献3

二级参考文献7

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部