摘要
分析了金沙江中游区域梯级水电站联合调度的特殊性及复杂性,从电调的角度介绍了金中集控中心自成立以来对受控梯级水电站联合调度的具体实施,总结了梯级水电站联合优化调度的措施,并分析了梯级水电站联合优化调度的综合效益,发现优化调度成效明显。
This paper analyses the particularity and complexity of joint operation of cascade hydropower stations in the middle reaches of Jinsha River,and introduces the specific implementation of joint operation of controlled cascade hydropower stations by Jinzhong Central Control Center since its establishment from the perspective of electric regulation.At the same time,this paper also summarizes the measures for joint optimal operation of cascade hydropower stations,and analyses the comprehensive benefits of joint optimal operation of cascade hydropower stations,and finds that the effect of optimal operation is obvious.
作者
胡秀成
王旭
徐天宇
朱兴文
HU Xiu-cheng;WANG Xu;XU Tian-yu;ZHU Xing-wen(Yunnan Jinsha River Hydropower Development Corporation Limited,Kunming 650228,China;College of Water Resources and Electricity,Heilongjiang University,Haerbin 150080,China;Dali University,Dali 671003,China)
出处
《云南水力发电》
2021年第3期217-221,共5页
Yunnan Water Power
关键词
金沙江中游
梯级水电站
优化调度
middle reach of Jinsha River
cascade hydropower stations
optimal operation