期刊文献+

大采高工作面过断层围岩控制分析 被引量:2

Analysis on Surrounding Rock Control of Working Face with Large Mining Height Passing through Faults
下载PDF
导出
摘要 以大采高工作面过断层围岩控制为对象开展探究。结合具体工程实际,在利用数值模拟手段分析围岩破坏特征的基础上,对围岩控制方式做出探究,并对其应用效果进行分析。结果表明,所设计方案实现了对围岩的有效控制,提升了工作面过断层的安全性。 Research was carried out on the surrounding rock control of a working face with large mining height passing through faults.Combining with the actual project,based on analyzing the failure characteristics of surrounding rock by numerical simula-tion,this paper explored the control method of surrounding rock,and analyzed its application effect.The results showed that the scheme achieved effective control of surrounding rock and improved the safety of working face passing through faults.
作者 陈云凡 CHEN Yunfan(Kaiyuan Mining Co.,Ltd.of Shouyang,Yangquan Coal Industry Group,Shouyang 045400,Shanxi,China)
出处 《能源与节能》 2021年第3期28-29,共2页 Energy and Energy Conservation
关键词 矿井 大采高 过断层 围岩破坏 围岩控制 mine large mining height passing through fault surrounding rock failure surrounding rock control
  • 相关文献

参考文献6

二级参考文献25

共引文献10

同被引文献8

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部