期刊文献+

金沟河引水枢纽除险加固工程水工模型试验探讨 被引量:4

Discussion on Hydraulic Model Test of Danger Removal andReinforcement Project of Jingou River Diversion Project
下载PDF
导出
摘要 对不同频率洪水工况下金沟河引水枢纽除险加固工程进行水工模型设计及试验研究,具体包括引水分流试验、泄洪试验、设计洪水流速试验和输沙试验。试验成果表明:在不同流量情况下,引水渠到符合设计流量泄流要求,且通过泄洪闸的合理调度,能防止泥沙进入引水渠,并快速排沙。结论可为金沟河引水枢纽除险加固工程以及同类型分洪建筑物多、泄流情况复杂的工程除险方案设计提供参考。 In this paper,the hydraulic model design and experimental research of the Jingou River Diversion Project under different frequency flood conditions are carried out.This research specifically includes water diversion flow test,flood discharge test,design flood velocity test and sediment transport test.The test results show that the diversion channel meets the design flow discharge requirements under different flow conditions.Moreover,the reasonable dispatch of the flood gate can prevent the sediment from entering the diversion channel and quickly discharge the sand.The conclusion can provide a reference for the design of the danger elimination and reinforcement project of the Jingou River Diversion Project and the design of the engineering elimination scheme with many flood diversion structures of the same type and complicated discharge conditions.
作者 刘婷婷 Liu Tingting(Water Conservancy Management Center of Xinjiang Jingou River Basin Administration,Shawan 832100,Xinjiang)
出处 《陕西水利》 2021年第2期192-193,199,共3页 Shaanxi Water Resources
关键词 引水分流 水工模型试验 金沟河引水枢纽除险加固工程 Diversion water flow hydraulic model test Jingou River diversion project danger elimination and reinforcement project
  • 相关文献

参考文献3

二级参考文献4

共引文献13

同被引文献51

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部