摘要
合肥市肥东污水处理厂四期工程近期设计规模5万m^(3)/d,设计出水水质在执行DB 34/2710—2016巢湖流域城镇污水处理厂和工业行业主要水污染排放限值的基础上,COD_(Cr)和TP两项主要指标浓度分别不高于30(40)mg/L和0.05 mg/L。通过对现状进水水质分析和相关中试结果的充分研究,提出了处理效果好、稳定性高的“改良A^(2)/O+高效沉淀池+反硝化深床滤池+高效气浮池+加氯接触消毒”处理工艺。详细介绍了该工程的工艺选择、主要构筑物参数及设计亮点。
The recent design scale of Hefei Feidong sewage treatment plant phase Ⅳ project is 50000 m^(3)/d,based on the discharge limits of major water pollutants for municipal wastewater treatment plants&industries in the Chaohu basin DB 34/2710—2016,the concentrations of COD_(Cr) and TP were no higher than 30(40)mg/L and 0.05 mg/L.Based on the analysis of the current inlet water quality and the relevant pilot test results,a treatment process of“improved A^(2)/O+high-efficiency sedimentation tank+denitrification deep-bed filter+high-efficiency air flotation tank+chlorination contact disinfection”with good treatment effect and high stability was proposed.The process selection,main structure parameters and design highlights of the renovation project are introduced in detail.
作者
陈奇良
王桂祥
赵义君
Chen Qiliang;Wang Guixiang;Zhao Yijun(Sixth Design Institute,Shanghai Municipal Engineering Design Institute Group Co.,Ltd.,Hefei 230061,China)
出处
《山西建筑》
2021年第8期98-100,共3页
Shanxi Architecture