期刊文献+

云南红河县龙然村滑坡成因分析及治理方案

THE GENESIS ANALYSIS AND CONTROL PLAN OF LONGRAN VILLAGE SLIDE IN HONGHE,YUNNAN
下载PDF
导出
摘要 云南红河县龙然村滑坡为一浅层牵引式破碎松散层滑坡,连续的降雨是诱发滑坡的主要因素。该滑坡的治理应采用“挡+排”的综合治理,“档”即在滑坡上缘设置抗滑桩、档板和毛石混凝土挡墙;“排”即沿滑坡顶、滑坡体两侧分别设置截水和排水沟,将地表水及雨水排出滑坡体外,以保证该滑坡体的稳定。 Longran village slide I Honghe,Yunnan is a slide of shallow traction loose bed.The continuous raining is the main derivation factor of slide.It must be controlled comprehensively by“Block+Drainage”.“Block”means the anti-slide pole,block board and rubble concrete block wall set up on the slide;“Drainage”is to set up water-intercept and drainage ditch on the top and both sides of slide,drain the surface water and raining water away from the slide to keep the slide in stable state.
作者 余莉 潘江涛 YU Li;PAN Jiang-tao(Team 308,Yunnan Bureau of Nonferrous Geology,Kunming 650217;Kunming Comprehensive Survey Center of Natural Resources,China Geological Survey Bureau,Kunming 650001)
出处 《云南地质》 2021年第1期122-126,共5页 Yunnan Geology
关键词 滑坡 成因 稳定性 综合治理 云南红河龙然村 Slide Genesis Stability Comprehensive Control LongranVillage,Honghe,Yunnan
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部