犍为岷江特大桥主跨458 m钢管混凝土拱桥施工关键技术 被引量:7

Key Techniques for Construction of 458 m-span Concrete-filled Steel Tube Arch Bridge of Qianwei Minjiang River Bridge
下载PDF
导出
摘要 G4216仁寿经沐川至屏山新市高速公路控制性工程犍为岷江特大桥主桥采用主跨458 m中承式钢管混凝土拱桥。主桥由主拱圈、桥面梁和附属结构三部分组成。主要介绍该桥的总体制造思路、制造关键重难点及解决思路、大节段整体运输重难点及解决思路、现场安装重难点及解决思路。 The main bridge of Qianwei Minjiang River Bridge in G4216 Renshou from Muchuan to Pingshan New City Expressway Control Project is a 458 m-span half-through concrete-filled steel tube arch bridge.The main bridge is composed of three parts of main arch ring,bridge deck beam and auxiliary structure.The overall manufacturing ideas,key manufacturing difficulties and solutions,large segmental overall transportation difficulties and solutions,and field installation difficulties and solutions of this bridge are mainly introduced.
作者 陈文强 叶顺 桂文涛 胡元峰 CHEN Wenqiang;YE Shun;GUI Wentao;HU Yuanfeng
出处 《城市道桥与防洪》 2021年第3期107-112,M0013,共7页 Urban Roads Bridges & Flood Control
关键词 中承式 钢管混凝土拱桥 制造技术 桥梁施工 总体布置 大节段运输 half-through concrete-filled steel tube arch bridge manufacturing technology bridge construction overall layout large-segmental transportation
  • 相关文献

共引文献1

同被引文献57

引证文献7

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部