摘要
研究大型机场工程总进度目标论证的目的、指导思想、基础工作、综合分析基本内容和方法等,探讨大型机场工程总进度目标论证的过程和方法体系,并通过对实例的工程概况及内容分析和工期讨论,为大型机场工程项目总进度目标论证提供方法和借鉴参考。
This paper studies the purpose,guiding ideology,basic work,basic content and methods of comprehensive analysis of the general progress target demonstration of large-scale airport projects,discusses the process and method system of the general progress target demonstration of large-scale airport projects.And passes the project overview and content of examples analysis and construction period discussion provide methods and references for the demonstration of the overall progress target of large-scale airport engineering projects.
作者
陈玉君
陈建国
唐可为
CHEN Yujun;CHEN Jianguo;TANG Kewei(Institute of Engineering Management,Tongji University,Shanghai 200082,China)
出处
《工程经济》
2021年第2期28-33,共6页
ENGINEERING ECONOMY
基金
民航安全能力建设资金项目“北京新机场工程建设与运营筹备总进度综合管控”(KZ0120020192811)。
关键词
机场工程
建设总进度
目标论证
类比
airport project
general schedule
demonstration of schedule target
analogy