摘要
PPP高速公路项目的建设和运营周期一般较长,有必要在PPP项目合同中针对与项目成本和收益具有重要关系的一些内容设定调整条件和调整方式。结合高速公路PPP项目,针对物价上涨等因素论述对工程造价的调整、对运营维护成本的调整和对项目收益的调整三个方面,以期为类似项目合同调整提供参考。
The construction and operation cycle of PPP expressway project is generally long,so it is necessary to set adjustment conditions and adjustment methods in PPP project contract for some contents that have an important relationship with project cost and benefit.Combined with highway PPP project,this paper discusses the adjustment of project cost,operation and maintenance cost and project income in view of price rise and other factors,so as to provide reference for similar project contract adjustment.
作者
路铁军
史翠荣
LU Tiejun;SHI Cuirong(School of Economics and Management,Shijiazhuang Tiedao University,Shijiazhuang 050043,China)
出处
《工程经济》
2021年第2期37-40,共4页
ENGINEERING ECONOMY
基金
河北省社科基金“PPP模式下交通基础设施融资机制研究”(HB18GL065)。