期刊文献+

基于SD模型的装配式建筑项目风险管理研究 被引量:4

Research on Risk Management of Prefabricated Building Projects Based on SD Model
下载PDF
导出
摘要 采用风险分解结构法识别装配式建筑项目在全生命周期各阶段可能存在的风险因素,并结合系统动力学(SD)方法分析风险因素的逻辑关系,建立风险识别反馈图和风险流程图,对项目各阶段的风险因素进行综合识别,并运用模糊层次分析法对项目各阶段存在的风险因素评价打分,识别项目各阶段的关键风险因素,并给出应对措施,为促进我国装配式建筑的健康发展提供指导和参考。 This paper uses the risk decomposition structure method to identify the risk factors that may exist in each stage of the whole life cycle of the prefabricated construction project,analyzes the logical relationship of the risk factors combined with the system dynamics(SD)method,establishes the risk identification feedback chart and risk flow chart,comprehensively identifies the risk factors in each stage of the project,and uses the fuzzy analytic hierarchy process to analyze the risk factors in each stage of the project.In order to provide guidance and reference for promoting the healthy development of prefabricated buildings in China,identifies and gives the key risk factors and countermeasures in each stage of the project.
作者 胡荣 王莹 冷斌 秦亚玲 HU Rong;WANG Ying;LENG Bin;Qin Yaling(School of Management,Shanghai University of Engineering Science,Shanghai 201620,China)
出处 《工程经济》 2021年第2期60-66,共7页 ENGINEERING ECONOMY
基金 上海工程技术大学研究生科研创新项目资助(20KY0333)。
关键词 装配式建筑 风险管理 SD模型 模糊层次分析法 prefabricated building risk management SD model fuzzy analytical hierarchy process
  • 相关文献

参考文献5

二级参考文献31

  • 1王其藩,宁晓倩,尤炯.系统动力学方法在项目风险管理中的优势(英文)[J].复旦学报(自然科学版),2005,44(2):201-206. 被引量:17
  • 2冯磊,周晶.Partnerring模式下工程项目管理的系统动力学模型[J].系统工程,2010,28(8):96-100. 被引量:8
  • 3蔡建民.基于项目动力学的房地产项目风险管理研究[J].管理现代化,2006,26(4):55-57. 被引量:3
  • 4FORRESTER J W. Industrial dynamics: a breakthrough for decision makers[J]. Harvard Business Review, 1958, 36(4): 37-66,.
  • 5FORRESTER J W. Industrial Dynamics[M]. Productivity Press, Cambridge MA, 1968.
  • 6Roberts. The Dynamics of Research and Development[M]. Harper & Row, New York, 1964.
  • 7Cooper K G. Naval ship production: a claim settled and a framework built[J]. Interfaces, 198{J, 10(6): 20-36.
  • 8严洋,路正南.基于系统动力学机制的工程项目管理研究[J].专题调查.
  • 9CARDENAS IC, AL-JIBOURI SHS, HALMAN JIM, et al. Captu- ring and integrating knowledge for managing risks in tunnel works [J]. Risk Analysis, 2013, 33 (1) : 92 -108.
  • 10RAZ T, SHENHAR A J, DVIR D. Risk management, project success and technological uncertainty [ J ]. R&D Management, 2002, 32 (2) : 101 - 109.

共引文献48

同被引文献27

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部