摘要 工程进度作为工程项目的三大目标之一,对项目的效益起着重大的影响,因此很有必要对建设工程进度的完工概率进行分析。由于施工过程中的各种不确定性,每个工序会存在多种完工情况,导致其难以被预测。为了解决上述问题,本文提出一种基于模糊贝叶斯网络的多态完工可靠性分析模型推算网络计划完工概率,并将该模型应用于实例中,对网络计划进行推理分析,从而验证了模型的可行性和有效性,研究结果可为工程管理者在进度风险决策方面提供参考。 As one of the three major goals of the project, the project schedule has a significant impact on the benefit of the project. Therefore, it is necessary to analyze the completion probability of the construction project schedule. Due to various uncertainties in the construction process, there will be multiple completion conditions for each process, making it difficult to predict.In order to solve the above problems, a multi-state completion reliability analysis model based on fuzzy Bayesian networks is proposed in this article to calculate the probability of completion of the network plan, the model is applied to an example to perform a reasoning analysis on the network plan, thus verifying the feasibility and effectiveness of the model.The research results can provide a reliable reference for project managers to make progress risk decisions.
作者 陈鹏 CHEN Peng(School of Transportation Engineering,Changsha University of Science and Technology,Changsha 410114,Hunan,China)
出处 《工程建设》 2021年第2期65-69,共5页 Engineering Construction
关键词 模糊贝叶斯网络 模糊集理论 工程进度网络 可靠性分析 fuzzy bayesian network fuzzy set theory engineering schedule network reliability analysis
  • 相关文献

参考文献10

二级参考文献52

  • 1陈瑞,黄建文.基于PERT的工程网络计划模糊完工概率分析[J].人民长江,2012,43(20):92-94. 被引量:7
  • 2曹光明,白思俊.国外PERT/CPM网络计划技术发展的三个方面[J].系统工程理论与实践,1993,13(3):1-10. 被引量:35
  • 3周汝胜,焦宗夏,王少萍.液压系统故障诊断技术的研究现状与发展趋势[J].机械工程学报,2006,42(9):6-14. 被引量:145
  • 4董豆豆,冯静,孙权,周经伦.模糊情形下基于贝叶斯网络的可靠性分析方法[J].系统工程学报,2006,21(6):668-672. 被引量:16
  • 5.JGJ/T 121-99.工程网络计划技术规程[S].,1999..
  • 6IAEA.Human Reliability Analysis in Probabilistic Safety Assessment for Nuclear Power Plants,A Safety Practice [R].IAEA Safety Series No.50-P-10,1995.
  • 7Nuclear Energy Agency,Critical Operator Actions:Human Reliability Modeling and Data Issues [R].NEA/CSNI/R(98)1,1998.227-236.
  • 8Werner W F,Hirano M,Kondo S,et al.Results and insights from level-1 probabilistic safety assessments for nuclear power plants in France,Germany,Japan,Sweden,Switzerland and the United States [J].Reliability Eng and Syst Safety,1995,48:165-179.
  • 9广东核电合营有限公司.岭奥核电站PSA报告 [R].广东核电合营有限公司,2000.Guangdong Nuclear Power Joint Venture Company LTD.PSA Report of Ling'ao Nuclear Power Plant [R].Guangdong Nuclear Power Joint Venture Company LTD,2000.(in Chinese)
  • 10Borst M V,Schoonakker H.An overview of PSA importance measures [J].Reliability Eng and Syst Safety,2001,72:241-245.

共引文献126

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部