期刊文献+

二次衬砌支护参数对围岩稳定性影响分析

Analysis on influence of secondary lining supporting parameters on surrounding rock stability
下载PDF
导出
摘要 在水工隧洞施工中,不仅要重视工程的安全性,还应该兼顾工程的经济性。文章以辽宁省大风口水库新建输水隧洞为例,构建FLAC3D三维有限元模型,利用数值模拟的方法,对二次衬砌混凝土参数进行优化研究。根据研究成果,建议二次衬砌选用厚40 cm的C25混凝土。 In the construction of hydraulic tunnel,we should not only pay attention to the safety of the project,but also give consideration to the economy of the project.In this paper,the FLAC3D three-dimensional finite element model is established by taking the newly-built water conveyance tunnel of Dafengkou Reservoir in Liaoning Province as an example.The parameters of secondary lining concrete are optimized by numerical simulation method.According to the research results,it is suggested that C25 concrete with a thickness of 40 cm should be used for the secondary lining.
作者 苗立业 MIAO Li-ye
出处 《东北水利水电》 2021年第4期48-50,72,共4页 Water Resources & Hydropower of Northeast China
关键词 输水隧洞 二次衬砌混凝土 围岩稳定性 water conveyance tunnel secondary lining concrete surrounding rock stability
  • 相关文献

参考文献9

二级参考文献55

共引文献169

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部