期刊文献+

基于风险管控的地铁车站施工方案优化技术 被引量:1

Optimization Technology of Subway Station Construction Scheme Based on Risk Control
下载PDF
导出
摘要 地铁车站施工的安全风险控制不当是导致地铁事故发生的主要原因。通过对地铁车站建设过程中主要的安全风险影响因素及常见的安全风险管控措施进行归纳,同时结合地铁车站施工的工程实例进行基于安全风险控制的施工方案比选优化,得到关于地铁车站安全风险管控的重要结论。 Improper safety risk control of subway station construction is the main cause of subway accidents.By summarizing the main safety risk influencing factors and common safety risk control measures in the process of subway station construction,and combined with the engineering example of subway station construction,this paper compares and optimizes the construction scheme based on safety risk control,and obtains important conclusions about the safety risk control of subway station.
作者 王刚 孙冲 WANG Gang;SUN Chong(Xi’an Railway Engineering Co.,Ltd.of China Railway Seventh Group Co.,Ltd.,Xi'an,Shaanxi 710032,China;Xi’an Thermal Power Research Institute Co.,Ltd.,Xi'an,Shaanxi 710054,China)
出处 《施工技术》 CAS 2021年第4期80-82,94,共4页 Construction Technology
基金 西安市社会发展科技创新示范项目(201805091SF18SF25)。
关键词 地铁车站 顶板施工 安全风险 风险控制 优化 subway stations top slab construction safety risk risk control optimization
  • 相关文献

参考文献8

二级参考文献29

共引文献194

同被引文献17

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部