摘要 饱和软黄土核心区高水位降水一直是工程亟待解决的关键问题之一。以西安地铁6号线施工为背景,结合理论分析、数值分析及现场监测深入探讨了降水方案、施工关键参数及关键施工工艺。研究表明:止水帷幕联合坑内降水工艺可作为饱和软黄土基坑降水的有效方案,工程中应密切关注附近水源补给对降水效果及沉降控制的影响。 The high water level precipitation in the core area of saturated soft loess is one of the key problems that need to be solved urgently but not solved well.Based on the construction of Xi'an Metro Line 6,combined with theoretical analysis,numerical analysis and on-site monitoring,this paper discusses the dewatering scheme,key construction parameters and key construction technology.The results show that the water stop curtain combined with pit dewatering technology can be used as an effective scheme for foundation excavation dewatering in saturated soft loess,and the influence of nearby water supply on the dewatering effect and settlement control should be paid close attention to.
作者 张亚龙 张玉峰 宋奇昱 张书敏 ZHANG Yalong;ZHANG Yufeng;SONG Qiyu;ZHANG Shumin(Xi’an Railway Engineering Co.,Ltd.of China Railway Seventh Group Co.,Ltd.,Xi'an,Shaanxi 710032,China;College of Civil Engineering,Xi’an University of Architecture and Technology,Xi'an,Shaanxi 710055,China)
出处 《施工技术》 CAS 2021年第4期91-94,共4页 Construction Technology
基金 陕西省重点研发计划项目(2020SF-373)。
关键词 基坑 饱和软黄土 高水位 降水 数值模拟 监测 foundation excavation saturated soft loess high water level dewatering simulation monitoring
  • 相关文献

参考文献8

二级参考文献49

共引文献54

同被引文献53

引证文献6

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部