期刊文献+

公路工程全过程造价管理提升对策研究

Research on Improving Countermeasures of Highway Engineering Cost Management in the Whole Process
下载PDF
导出
摘要 公路建设项目从立项到建成运营,需历经多个阶段,并分多次计价。每一个阶段的工程造价计价均具有其独立性,但又相互联系。然而,由于各个阶段的造价管理方法或内容衔接存有问题,无法形成贯穿全过程的造价信息链,导致造价管理难度加大。基于此,本文在全面了解公路工程造价管理重要性的基础上,分析了全过程造价管理存在的问题,并提出了几点建议,仅供参考。 A highway construction project needs to go through multiple stages from initiation to completion and operation,and the pricing is divided into multiple stages.The engineering cost calculation of each stage is independent,but they are connected with each other.However,there are problems in the cost management methods or content connection at various stages,and it is impossible to form a cost information chain throughout the whole process,which makes cost management more difficult.For this reason,on the basis of a comprehensive understanding of the importance of highway engineering cost management,this article analyzes the problems in the whole process of cost management,and puts forward several suggestions for reference only.
作者 吴禹 WU Yu(Henan Zhongyuan Expressway Co.,Ltd.,Zhengzhou Henan 450000)
出处 《智能建筑与工程机械》 2020年第12期85-86,共2页 Intelligent Building and Construction Machinery
关键词 公路工程 全过程造价管理 问题 重要性 highway engineering whole-process cost management problem importance
  • 相关文献

参考文献3

二级参考文献5

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部