4PETERSEN M K,AAGAARD J.Heat accumulators[EB/OL].(2004-01-01).http:www.kareliainvest.ru/file.php/id/f5291/name/ acro.pdf.
5AAU,EMD,PE,et al.Dissemination strategy on electricity balancing for large scale integration of renewable energy[EB/OL].(2007-05-01).http://www.project-desire.org/.
6ANDERSEN A N,LUND H.CHP-plants with big thermal stores balancing fluctuating productions from wind turbines[EB/OL].(2007-05-01).http:// desire.iwes.fraunhof er.de/files/deliverables/ del_4.1-4.4.pdf.
7STRECKIENE G,MARTINAITIS V,ANDERSEN A N,et al.Feasibility of CHP-plants with thermal stores in the German spot market[J].Applied Energy,2009,86(11):2308-2316.
8CHRISTIDIS A,KOCH C,POTTEL L,et al.The contribution of heat storage to the profitable operation of combined heat and power plants in liberalized electricity markets[J].Energy,2012,41 (1):75-82.
9AIKATERINI F,ANDERS N A,DAVID T.Exploration of economical sizing of gas engine and thermal store for combined heat and power plants in the UK[J].Energy,2008,33(11):1659-1670.
10DAVID T,AIKATERINI F.Do liberalised electricity markets help or hinder CHP and district heating?The case of the UK[J].Energy Policy,2008,36(4):1448-1456.