期刊文献+

Research on Pantograph and Overhead Contact System′s Simulation of High Speed Railway and Comparison of Three Calculation Methods by Finite Element Method

下载PDF
导出
摘要 This study relies on the project about Jining to Tongliao railway electrification reconstruction project.The dynamic simulation model of the pantograph-OCS(overhead contact system)suitable for Jitong project is designed,according to the corresponding numerical calculation method and workflow.Firstly,We establish the pantograph and catenary′s BIM models,and the parameters related to the dynamic simulation of the pantograph system are attached to the BIM model.Then,the BIM model is transformed into a mechanical analysis model,which is input into the dynamic simulation software of pantograph-OCS.The rationality of the design scheme of the pantograph system is verified through simulation.
出处 《International Journal of Plant Engineering and Management》 2021年第1期46-56,共11页 国际设备工程与管理(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部