三维全断面自动扫描技术在隧道施工中的运用 被引量:1

A Brief Discussion on the Application of 3D Full-face Automatic Scanning Technology in Tunnel Construction
下载PDF
导出
摘要 结合张吉怀高速铁路项目工程,阐述了三维全断面自动扫描技术在隧道施工中的应用。该技术能够有效地控制隧道超、欠挖,隧道初支、二衬混凝土方量,确保隧道开挖、初支及二衬断面均满足设计要求。该技术为今后类似工程施工提供一些可借鉴的经验。 Combined with Zhangjiajie-Jishou-Huaihua high-speed railway project,the application of 3D full-face automatic scanning technology in tunnel construction is expounded,which can effectively control the overbreak,underbreak,primary support and secondary lining concrete volume of the tunnel,and ensure that tunnel excavation,primary support and secondary lining section meet the design requirements.It also provides some reference experience for similar construction in the future.
作者 娄金亮 Lou Jinliang(China Railway 18th Bureau Group Co.LTD,Tianjin 300222)
出处 《石家庄铁路职业技术学院学报》 2021年第1期73-77,共5页 Journal of Shijiazhuang Institute of Railway Technology
关键词 隧道工程 三维全断面自动扫描 隧道施工应用 超欠挖 tunnel engineering,3D full face automatic scanning,tunnel construction application overbreak and underbreak
  • 相关文献

参考文献4

二级参考文献18

共引文献50

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部