摘要
在矿区钻探工程施工过程中,针对钻探工程的特点及现场施工条件,对受影响的原设计方案进行了优化,全面综合分析考虑,充分利用了一切可以利用的手段和措施,提高了工程的实用性、安全性,降低了工程成本。进一步升华了钻探方案,提高了工程质量,最大程度的减少了工程施工的风险与难度,实现了企业利益最大化,同时保证企业的投资决策质量和经济效益达到了双赢。
In the process of drilling engineering construction in mining area,according to the characteristics of drilling engineering and site construction conditions,the original design scheme affected is optimized,comprehensively analyzed and considered,and all available means and measures are fully used to improve the practicability and safety of the project and to reduce the project cost.It further sublimates the drilling scheme,improves the engineering quality,reduces the risk and difficulty of engineering construction to the greatest extent,realizes the maximization of enterprise interests,and ensures the quality of investment decision-making and economic benefits of enterprises to achieve a win-win situation.
作者
赵刚
ZHAO Gang(CNMC Fushun Hongtoushan Mining Co.,Ltd.,Fushun 113321,China)
出处
《有色矿冶》
2021年第2期10-12,32,共4页
Non-Ferrous Mining and Metallurgy
关键词
原始方案
优化方案
方案对比
结论建议
original scheme
optimization scheme
scheme comparison
conclusion and suggestion