3Cass J Donald. Earned Value Program for DOE Projects [M ], AACE-- I Transactions, 1998.
4T R BROWNINGS D EPPINGER. Modeling impacts of process ar- chitecture on cost and schedule risk in product development [J], IEEE Transactions on Engineering Management, 2002 (9) : 3 -8.
5A YASSINE, D FALKENBURG, K CHELST. Engineering design management: An information structure approach [ J]. International Journal of Production Research, 1999 (7) : 2 -8.
6ROBERT P SMITH, STEVEN D EPPINGER. Identifying controlling features of engineering design integration [J]. Management Science, 1997 (3): 2-9.
7J U MAHESWARL, K VARGHESE. Project scheduling using de- pendency structure Matrix[J]. International Journal of Project Management, 2005 (3) : 2 -7.
8C MEIER, A YASSINE, T R BROWNING. Design process sequen- cing with competent genetic algorithms[ J]. Transitions of ASME, 2007 (9): 2-6.