摘要 为优化地铁目标频段隔振排桩设计与选型,基于带隙理论和正交分析理论,针对桩长、排数、列数、隧道埋深以及排桩到隧道距离等因素对振动衰减效果的影响规律展开研究。研究表明,在粉质黏土地层条件下:(1)各因素对竖向振动衰减影响主次排序:隧道埋深>桩长、排数>列数>排桩到隧道距离;(2)各因素对水平振动衰减影响主次排序:排桩到隧道距离>隧道埋深、排数>桩长>列数;(3)为取得较好的竖直方向衰减效果,隧道埋深<0.8λ_(SV)时(λ_(SV)为土体剪切波波长),桩长宜取3.2λ_(SV);隧道埋深介于1.6λ_(SV)~2.4λ_(SV)时,可在1.6λSV~3.2λ_(SV)和4λ_(SV)~4.8λ_(SV)范围内增加桩长;排数达到3排就能取得较为稳定的隔振效果。 In order to optimize the design and selection of periodic pile barriers for vibration isolation within target frequency range of the subway,this paper studies the influence of pile length,row number,column number,tunnel buried depth and the distance between piles and tunnel on the vibration attenuation effects based on the band gap theory and the orthogonal analysis theory.Researches show that,on the condition of silty clay stratum:(1)The primary and secondary order of the influencing factors on the vertical vibration attenuation effect within the initial complete bandgap is:tunnel buried depth>pile length,row number>column number>distance between periodic piles and tunnel;(2)The primary and secondary order of the influencing factors on the horizontal vibration attenuation effect within the initial complete bandgap is:distance between periodic piles and tunnel>tunnel buried depth,row number>pile length>column number;(3)In order to achieve good vertical vibration isolation,when tunnel buried depth is less than 0.8λ_(SV),pile length should be 3.2λ_(SV);when tunnel buried depth is between 1.6λ_(SV)~2.4λ_(SV),pile length can be increased in the range of 1.6λ_(SV)~3.2λ_(SV) or 4λ_(SV)~4.8λ_(SV);when row number reaches 3,stable vibration isolation can be achieved.
作者 姜博龙 JIANG Bolong(Rail Transit Digital Construction and Measurement Technology National Engineering Laboratory,China Railway Design Corporation,Tianjin 300308,China)
出处 《铁道标准设计》 北大核心 2021年第4期127-133,共7页 Railway Standard Design
基金 中国铁路总公司科技研究计划系统性重大项目(P2018G049) 中国铁路设计集团有限公司科技开发项目计划重点课题(2020YY241012,7217131)。
关键词 地铁 环境振动 隔振桩 周期性 参数 正交分析 subway environmental vibration piles for vibration isolation periodicity parameters orthogonal analysis
  • 相关文献

参考文献6

二级参考文献44

共引文献47

同被引文献24

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部