摘要 随着我国经济的发展,人们对电力能源的需求也越来越高,面临的资源枯竭压力也在不断加大,开发新能源和可再生能源成为解决我国能源问题缺乏的主要方法与路径。风力发电与光伏发电作为新能源新技术有了很大的突破,但是这两种能源与常规使用能源之间相比较,还有一定的差距,在实际的调度过程当中依然会有很多问题,同时在并网的过程当中也会出现各种各样的问题,影响着并网的速度与效果。本文主要对风力发电和光伏发电并网问题进行了分析,研究了风力发电和光伏发电并网过程当中容易出现的问题,并提出了与之相对应的解决方法与措施。 With the development of my country's economy,people's demand for electric energy is also increasing,and the pressure of resource depletion is also increasing.The development of new energy and renewable energy has become the main method and path to solve the lack of energy in our country.Wind power and photovoltaic power generation have made great breakthroughs as new energy and new technologies.However,there is still a certain gap between these two energy sources and conventional energy sources.There are still many problems in the actual dispatching process.At the same time,In the process of grid connection,various problems will also appear,which affect the speed and effect of grid connection.This article mainly analyzes the problems of wind power and photovoltaic power grid connection,studies the problems that are easy to occur in the process of wind power and photovoltaic power grid connection,and proposes corresponding solutions and measures.
作者 林海 Lin Hai
机构地区 攀枝花学院
出处 《电力系统装备》 2021年第2期25-26,共2页 Electric Power System Equipment
关键词 风力发电 光伏发电 并网 wind power generation photovoltaic power generation grid connection
  • 相关文献

参考文献3

二级参考文献25

  • 1王志群,朱守真,周双喜,黄仁乐,王连贵.分布式发电对配电网电压分布的影响[J].电力系统自动化,2004,28(16):56-60. 被引量:414
  • 2马胜红.实施风力发电、生物质直燃发电、光伏发电溢出成本全网分摊的可行性分析[J].中国能源,2005,27(10):5-13. 被引量:3
  • 3陈海焱,陈金富,段献忠.含分布式电源的配电网潮流计算[J].电力系统自动化,2006,30(1):35-40. 被引量:235
  • 4王建华,吴季平,徐伟.太阳能应用研究进展[J].水电能源科学,2007,25(4):155-158. 被引量:38
  • 5Bernstein P. Alternative Energy: Facts, Statistics, and Issues [M]. Phoenix:Oryx Press, 2001.
  • 6Karki R, Billinton R. Cost-effective Wind Energy Utilization for Reliable Power Supply [J]. IEEE Trans. Energy Convers. , 2004,19 (2) : 435-440.
  • 7Billinton R, Bai G. Generating Capacity Adequacy Associated with Wind Energy [J]. IEEE Trans. Energy Convers. ,2004,19(3) :641-646.
  • 8Wang X, Dai H,Thomas R J. Reliability Modeling of Large Wind Farms and Electric Utility Interface Systems [J]. IEEE Trans. PAS, 1984, 103 (3): 569-575.
  • 9Abouzahr I,Ramakumar R. An Approach to Assess the Performance of Utility-interactive Wind Electric Conversion Systems[J]. IEEE Trans. Energy Convers. ,1991,6(4) :627-638.
  • 10Karki R, Hu P. Wind Power Simulation Model for Reliability Evaluation[A]. Proc. IEEE Can. Conf. Electr. Comput. Eng. [C]. Saskatoon.. IEEE Press, 2005 : 541-544.

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部