本文基于核电厂设备运行维修手册(EOMM)文件的重要性,综合分析前期首堆工程建设期间EOMM文件管理存在问题,从规范标准、审查流程、移交归档等方面探索和优化EOMM文件管理,为后续核电厂项目在全面推进工程EOMM文件过程控制、提升EOMM文件编制质量和优化EOMM文件审查与移交流程提供参考和借鉴,为核电厂设备长期高效、经济、稳定运行奠定基础。
Based on the importance of equipment operation and maintenance manual(eomm)document of nuclear power plant,this paper comprehensively analyzes the existing problems of eomm document management during the construction of initial reactor,explores and optimizes the eomm document management from the aspects of standard,review process,handover and filing,so as to comprehensively promote the process control of eomm document and improve the quality and quality of eomm document preparation for subsequent nuclear power plant projects The eomm document review and handover process provides reference and reference for the longterm efficient,economic and stable operation of nuclear power plant equipment.
出处
《电力系统装备》
2021年第2期157-158,共2页
Electric Power System Equipment
关键词
首堆
EOMM
规范标准
审查流程
优化
first reactor
eomm
specification and standard
review process
optimization