双动力头钻机全套管成孔在咬合桩施工中的应用 被引量:1

Application of full casing drilling with double power head drilling machine in construction of occluded pile
下载PDF
导出
摘要 本文以泉州台商投资区海湾大道双山段道路及景观工程2号雨水泵站围护工程为例,在地下水位较高、地层渗透系数较大、砂层较厚等不良地质状况下,对咬合桩施工采用双动力头钻孔机辅以全套管成孔的施工方法、优势进行阐述,并总结了施工中的注意事项和质量控制措施。 Based on the No.2 rain water pump station project of Haiwan Avenue in Quanzhou Taiwan investment area.This paper introduces the construction method and advantages of double power head drilling machine supplemented by full casing hole forming in the construction of occluded pile to deal with the unfavorable geological conditions such as high groundwater table,large permeability coefficient of stratum and thick sand layer.The precautions and quality control measures during the construction are also summarized.
作者 薛银山 XUE Yin-shan(CCCC First Highway Xiamen Engineering Co.,Ltd.,Xiamen 361021,China)
出处 《地基处理》 2021年第1期82-87,共6页 Journal of Ground Improvement
关键词 双动力头钻孔机 咬合桩 全套管成孔 double power head drilling machine occluded pile full casing drilling
  • 相关文献

参考文献4

二级参考文献8

共引文献10

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部