摘要
通过对区间和车站钢轨电位的计算,并结合了综合接地最小接地电阻的因素进行了分析,提出高速铁路完全横向连接线和回流吸上线的优化方案,尽可能减小钢轨电位。
In this paper,in order to minimize rail potential,optimization schemes for complete transverse connection lines and boosting cable of return currents for high-speed railways are proposed by calculating the rail potential in sections and stations and analyzing the factors of minimum grounding resistance.
作者
陈玉泉
张晓庆
Chen Yuquan;Zhang Xiaoqing
出处
《铁路通信信号工程技术》
2020年第S01期66-69,共4页
Railway Signalling & Communication Engineering
关键词
完全横向连接
吸上线
牵引回流
钢轨电位
complete transverse connection
boosting cable
traction return current
rail potential