地铁盾构长大隧道测量施工技术研究 被引量:6

Construction Technology Research on Survey of Long Distance and Large Radius Shield Tunnel
下载PDF
导出
摘要 结合广州市轨道交通22号线工程,针对2 km以上长距离隧道工程施工需要高精度控制测量技术配合的重难点,对控制测量技术进行分析和论证,创新提出打孔定向测量施工控制技术、陀螺仪定向测量施工技术、地表深层监测施工技术,并对其施工流程进行详细分析探讨。工程实践证明,通过三项地铁盾构隧道测量施工技术的应用,不但提高了施工功效,而且提高了隧道测量精度,减小了贯通误差,确保了盾构隧道得以安全顺利贯通。 Combined with the rail transit project of Guangzhou Metro Line 22,aiming at the difficulties of high precision control survey technology used in the construction of long-distance tunnel more than 2 km,this paper analyzes and demonstrates the control survey technology,and puts forward the drilling directional measurement technology,gyroscope directional measurement construction technology and surface deep monitoring construction technology,and discusses the construction process in detail.Engineering practice has proved that the application of three subway shield tunnel surveying construction technologies not only improves the construction efficiency,but also ensures the tunnel surveying accuracy,reduces the penetration error,and ensures the safe and smooth penetration of the shield tunnel.
作者 刘宏 LIU Hong(China Railway 19th Bureau Group Rail Transit Engineering Co.Ltd.,Beijing 101300,China)
出处 《铁道建筑技术》 2021年第2期115-118,共4页 Railway Construction Technology
基金 中国铁建股份有限公司科技研究开发计划项目(17-9A)。
关键词 盾构施工 定向测量 控制点 shield construction directional measurement control point
  • 相关文献

参考文献5

二级参考文献46

共引文献33

同被引文献53

引证文献6

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部