摘要
在高速铁路建设过程中,四电接口工程是非常重要的组成部分。通过研究四电接口工程的特点和重要性,并结合盐通铁路四电接口工程的问题和解决方案,采取的管理措施及取得的效果,为以后的高速铁路四电接口工程管理提供参考借鉴。
In the process of the high-speed railway construction,the integrated electrical interface is a very important part.Based on the study of the characteristics and importance of the integrated electrical interface,combined with the problems and solutions of the integrated electrical interface of the Yancheng-Nantong high-speed railway,the management measures adopted and the results achieved,provide some references for the future management of the integrated electrical interface of the high-speed railway.
作者
胡刚
Hu Gang(China Railway Design Corporation,Tianjin 300308,China)
出处
《山西建筑》
2021年第9期116-118,共3页
Shanxi Architecture
关键词
高速铁路
四电接口
工程管理
工程质量
high-speed railway
integrated electrical interface
engineering management
engineering quality