期刊文献+

盐通铁路四电接口工程管理 被引量:3

The management of the integrated electrical interface of the Yancheng-Nantong high-speed railway
下载PDF
导出
摘要 在高速铁路建设过程中,四电接口工程是非常重要的组成部分。通过研究四电接口工程的特点和重要性,并结合盐通铁路四电接口工程的问题和解决方案,采取的管理措施及取得的效果,为以后的高速铁路四电接口工程管理提供参考借鉴。 In the process of the high-speed railway construction,the integrated electrical interface is a very important part.Based on the study of the characteristics and importance of the integrated electrical interface,combined with the problems and solutions of the integrated electrical interface of the Yancheng-Nantong high-speed railway,the management measures adopted and the results achieved,provide some references for the future management of the integrated electrical interface of the high-speed railway.
作者 胡刚 Hu Gang(China Railway Design Corporation,Tianjin 300308,China)
出处 《山西建筑》 2021年第9期116-118,共3页 Shanxi Architecture
关键词 高速铁路 四电接口 工程管理 工程质量 high-speed railway integrated electrical interface engineering management engineering quality
  • 相关文献

参考文献4

二级参考文献10

  • 1铁集成[2006]220号客运专线综合接地技术实施办法(暂行)[S].
  • 2咨询联合体.武广铁路客运专线接口管理[Z].武汉:咨询联合体,2006.
  • 3汤晓光.做好接口管理,建设系统、完整的武广客运专线[Z].武汉:武广铁路客运专线有限公司,2006.
  • 4吕继涛.接口管理培训[Z].武汉:武广铁路客运专线有限公司,2007.
  • 5武广铁路客运专线有限公司.武广铁路客运专线接口管理办法(暂行)[S].武汉:武广铁路客运专线有限公司,2006.
  • 6中铁第四勘察设计院集团有限公司.武广客运专线咨询项目部接口咨询管理实施细则[S].武汉:中铁第四勘察设计院集团有限公司,2006.
  • 7通用参考图(通号[2009]9301)铁路综合接地系统[S].
  • 8经规标准[2009]62号关于铁路综合接地系统通用参考图[S].
  • 9中铁第四勘察设计院集团有限公司.合福隧参10隧道接触网槽道预留安装参考图[s].武汉:中铁第四勘察设计院集团有限公司,2010.
  • 10京福闽赣铁路客运专线有限公司.合福铁路闽赣段接口管理实施办法[s].福州:京福闽赣铁路客运专线有限公司,2010.

共引文献17

同被引文献17

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部