摘要 挂篮法与支架法在桥梁建设中均属于成熟的施工方法,本文的工程项目采用支架法施工桥跨结构,但局部箱梁因施工条件复杂,采用挂篮法结合支架法组织施工。本文通过介绍施工条件、归纳施工要点、执行具有针对性的工程质量监督方式,取得了较好的监管成效。 Both the suspended cradle method and the support method are mature construction methods in bridge construction.The project of this paper adopts the support method to construct the bridge span structure,but because of the complex construction conditions of local box girder,the suspended cradle method combined with the support method is used to organize the construction.This paper introduces the construction conditions,summarizes the key points of construction,and carries out the targeted project quality supervision mode,which has achieved good supervision results.
作者 陈竹师 CHEN Zhushi
出处 《福建建设科技》 2021年第2期58-60,共3页 Fujian Construction Science & Technology
关键词 挂篮法 支架法 市政工程 质量监督 suspended cradle method support method municipal engineering quality supervision
  • 相关文献

参考文献3

二级参考文献4

共引文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部