半潜式平台船体装船工况下,装船抬梁上承半潜式平台船体外板,下接液压设备和滑道,是滑移装船承上启下的主要承重结构。因此,详细描述大型船体滑移装船抬梁建造方法,主要包括抬梁结构形式、抬梁分段划分以及抬梁装配流程,为船体抬梁预制提供了有益的参考。
Under the ship loading condition of the semi-submersible platform hull,the hull plate of the semi-submersible platform hull,the hydraulic equipment and the slideway are the main load-bearing structures of the sliding ship.A detailed description of the construction method of lifting beams for large-scale hull sliding loading ships,the main contents include beam lifting structure form,beam lifting segmentation and beam lifting assembly process,which provide a useful reference for the prefabrication of ship hull beam lifting.
作者
韩辉
赵立君
张耀
李志强
姜立群
HAN Hui;ZHAO Lijun;ZHANG Yao;LI Zhiqiang;JIANG Liqun(Offshore Oil Engineering(Qingdao)Co.,Ltd.,Qingdao 266520)
出处
《现代制造技术与装备》
2021年第3期98-99,共2页
Modern Manufacturing Technology and Equipment
关键词
半潜式平台
船体
抬梁
semi-submersive platform
hull
girder