本文以福建省某高速公路项目施工索赔管理为依托,探讨了实施过程中建设工程款支付不及时(足额)造成的间歇式停工损失索赔方案选取及费用测算方法。
Based on the construction claim management of an expressway project in Fujian Province,this paper discusses the selection of compensation schemes and cost calculation methods for intermittent shutdown losses caused by untimely(full)construction project payments during the implementation process.
作者
蒙健生
MENG Jian-sheng(CCCC Fourth Highway Engineering Co.,Ltd.,Beijing 100020,China)
出处
《价值工程》
2021年第8期17-18,共2页
Value Engineering
关键词
间歇式停工
索赔方案
费用测算
intermittent shutdown
claim plan
cost estimation