摘要
针对海口市沿海某房建项目冲孔灌注桩计量计价过程中遇到的问题进行分析,提出解决方案,总结冲孔灌注桩施工影响工程计量计价的因素,对后续类似项目计量计价提供参考。
This paper analyzes the problems encountered in the process of measurement and valuation of punched cast-in-place piles in a coastal housing construction project in Haikou City,proposes solutions and summarizes the factors that affect the engineering measurement and valuation of punched cast-in-place piles,and provides reference for the measurement and valuation of similar subsequent projects.
作者
林锟
LIN Kun(The Sixth Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.,Zhuhai 519000,China)
出处
《价值工程》
2021年第8期114-115,共2页
Value Engineering
关键词
复杂地质
冲孔桩
计量
计价
complex geology
punch pile
measurement
valuation