摘要 为及时发现深井开采可能诱发的地压灾害和安全管理问题,针对夹皮沟矿业公司二道沟矿深井开采实际,采用L20型爆破测振仪对-1410 m中段主运输巷道掘进过程中的爆破震动波进行实时监测与数据分析,获得了深井高应力巷道掘进中的爆破振动特征和传播规律。巷道掘进过程中爆破震动波沿巷道竖直方向的速度衰减最大,沿巷道径向的速度衰减最小;爆破振动频率为150~400 Hz,频率较高,频率范围较宽,属于高频振动,频率对振动破坏影响较小。监测结果为矿山巷道爆破参数优化和长期稳定性分析提供了重要技术支撑,可为同类矿山提供借鉴。 In order to find out possible ground pressure disasters and safety management problems caused by deep mining in time,in view of the practice of deep mining in Erdaogou Mine of Jiapigou mining company,the L20 blasting vibrometer is used to monitor and analyze the blasting vibration wave in the excavation process of the main transportation roadway on the level of-1410 m,and the characteristics and propagation law of blasting vibration in the excavation process of high stress roadway in deep mines are obtained.In the process of roadway excavation,the velocity attenua-tion of blasting vibration wave along the vertical direction of the roadway is the largest,and the velocity attenuation along the radial direction of the roadway is the smallest;the blasting vibration frequency is 150-400 Hz,the frequency is high,and the frequency range is wide,which belongs to high-frequency vibration,and the frequency has little influence on the vibration damage.The monitoring results provide important technical support for mine roadway blasting parameter optimization and long-term stability analysis,and can be used as a reference for similar mines.
作者 吴清明 曹敏 Wu Qingming;Cao Min(China Gold Group Jiapigou Mining Co.,Ltd.)
出处 《黄金》 CAS 2021年第4期40-43,共4页 Gold
基金 国家重点研发计划项目(2016YFC0600707)。
关键词 深井开采 巷道掘进 爆破振动 振动监测 爆破规律 deep mining roadway excavation blasting vibration vibration monitoring blasting law
  • 相关文献

参考文献5

二级参考文献35

  • 1余永强,杨小林,王伟.矿山爆破开采对周围建筑物的影响[J].金属矿山,2004,33(10):69-72. 被引量:18
  • 2T.J.怀特,R.A.法恩菲尔德,冀湘.计算机与爆破(一)[J].国外金属矿山,1994,19(4):85-89. 被引量:5
  • 3GB6722-2003爆破安全规程[S].北京:中国标准出版社,2004:42-43.
  • 4Grabb G I, Hiller D M, New B M. Ground Vibrations Caused by the Construction and Operation of Transport Systems [ A ]. In : Proc 3 rd Int Symp Field Measurements in Geomechanics[ C]. Oslo A A Balkema: [ s. n. ], 1991, 1 ( 1 ) :443-454.
  • 5New B M. Ground Vibration Caused by Civil Engineering Works [ J ]. Transport and Road Research Laboratory ( TR2RL), Crowthorne ,1986 (6) :54-73.
  • 6Siskind D E. Ground and Air Vibrations from Blasting [ M ]. New York: SME Mining Engineering Handbook SMEA IME, 1973.
  • 7Hendren A J, Aiyer A K. Stresses and Strains around a Cylindrical Tunnel in an Elastic-plastic Material with Dilatency[ J ]. U S Army Corps of Engineers, Omaha District ,NE ,Tech, 1972, (4) :10-83.
  • 8Langefors U, Kihlstrom B. The Modem Technique of Rock Blasting [ A]. In: J Wiley 3rd Edn [ C ]. New York: [s.n. ] ,1978.
  • 9黄吉顺,蒋志光.爆破振动工程特性及其安全技术措施[A].见:工程爆破文集(第六辑)[C].深圳:海天出版社,1997.
  • 10Dowing C H. Blast Vibration Monitoring and Control[J]. Prentice Hall ,Englewood, NJ, 1985 (3) :297-235.