矮塔斜拉桥塔梁同步施工阶段塔梁墩固结部位局部应力分析 被引量:7

Local Stress Analysis of Pier-tower-girder Fixed Segment During the Tower-beam Synchronous Construction Stage of an Extradosed Cable-stayed Bridge
下载PDF
导出
摘要 文中以采用塔梁同步施工的新建某矮塔斜拉桥为工程背景,采用有限元软件建立塔梁墩固结部位局部实体分析模型,对桥梁整个塔梁同步施工过程进行模拟,分析重要施工阶段的塔梁墩固结部位局部应力大小及分布规律,并将有限元计算结果与实测数据对比,相互验证计算结果和测试结果的准确性。 Based on the engineering background of a new extradosed cable-stayed bridge with tower-beam synchronous construction,the finite element software is used to establish the local solid analysis model of the tower-beam-pier consolidation segment,and the synchronous construction process of the whole tower beam is simulated.The local stress distribution law of the tower-beam-pier consolidation segment in several important construction stages are analyzed and summarized.Therefore,the finite element calculation results are compared with the measured data to verify the accuracy of the calculation results and the test results.
作者 杨德厚 邓同生 李顺波 YANG Dehou;DENG Tongsheng;LI Shunbo(CCCC Second Highway Survey, Design and Research Institute Co., Ltd., Wuhan 430050, China;Chongqing Traffic Engineering Quality Inspection Co., Ltd., Chongqing 400060, China)
出处 《交通科技》 2021年第2期28-33,共6页 Transportation Science & Technology
关键词 塔梁同步施工 塔梁墩固结 局部应力 实体有限元模型 simultaneous construction of tower beam pier-tower-girder fixed segment local stress solid finite element model