某大跨度可开合空间网架屋盖连续倒塌分析 被引量:2

Progressive Collapse Analysis for A Large Span Openable Truss Roof
下载PDF
导出
摘要 针对某大跨度可开合空间网架屋盖,分析其在17级台风荷载作用下的抗连续倒塌性能。采用构件拆除法,分别拆除结构敏感性最高的单根、前6根及前10根杆件,按一阶屈曲模态分布考虑初始缺陷的影响,通过结构极限承载力的变化来评估拆除杆件后是否会引发其连续倒塌。结果表明,结构在17级台风作用下开合屋盖结构单根构件失效后仍然拥有较高的冗余度,当拆除屋盖敏感性最高的前十根杆件后,不会引发屋盖的连续倒塌。 Progressive collapse resistance of a large span openable truss roof is analyzed under the action of the 17th typhoon.Using the component removal method,the first single,six and ten members with the highest structural sensitivity were removed,and the change in the ultimate bearing capacity of the structure was used to evaluate whether the structure would cause progressive collapse consider the influence of initial imperfections according to the first-order buckling mode distribution.The results show that the structure still has a high degree of redundancy after the failure of a single member of the openable roof structure under the action of the 17th typhoon.When the 10 key members of the structure are removed,progressive collapse of openable roof will not happen.
作者 李娟 纪腾飞 葛鹏 Li Juan;Ji Teng-fei;Ge Peng
出处 《建筑技术开发》 2021年第6期9-10,共2页 Building Technology Development
基金 国家科技重大专项(2018ZX06002002)。
关键词 开合屋盖 构件拆除法 连续倒塌 极限承载力 openable truss roof alternate path method progressive collapse ultimate bearing capacity
  • 相关文献

参考文献3

二级参考文献31

  • 1霍静思,胡聪伶,张晋清,郭玉荣,肖岩.典型钢框架结构节点的动态力学性能与延性分析[J].土木建筑与环境工程,2012,34(S1):149-154. 被引量:8
  • 2蔡建国,朱奕锋,冯健,涂永明.撑杆失效对张弦结构抗连续倒塌性能的影响[J].建筑结构学报,2015,36(6):78-85. 被引量:8
  • 3中华人民共和国建设部,国家质量技术监督检验检疫总局.GB50011-2010建筑抗震设计规范[S].北京:中国建筑工业出版社,2010.
  • 4YANG Bo,TAN Kanghai.Experimental tests of different types of bolted steel beam-column joints under a central-column- removal scenario[J].Engineering Structures,2013,54:112.
  • 5YANG Bo,TAN Kanghai.Numerical analyses of steel beam- column joints subjected to catenary action[J].Journal of Constructional Steel Research,2012,70:1.
  • 6LI Ling,WANG Wei,CHEN Yiyi,et al.Experimental investigation of beam-to-tubular column moment connections under column removal scenario[J].Journal of Constructional Steel Research,2013,88:244.
  • 7Federal Emergency Management Agency.FEMA-350 Recom- mended seismic design criteria for new steel moment-frame buildings[S].Washington D C:Federal Emergency Management Agency,2000.
  • 8Federal Emergency Management Agency.FEMA-351 Recom- mended seismic evaluation and upgrade criteria for existing welded steel moment-frame buildings[S].Washington D C:Federal Emergency Management Agency,2000.
  • 9Department of Defense.UFC4-023-03 Design of buildings to resist progressive collapse[S].Washington D C:Department of Defense,2009.
  • 10Lew H S,Main J A and,Robert S D,et al.Performance of steel moment connections under a column removal scenario.I:experiments[J].Journal of Structural Engineering,2013,139(1):98.

共引文献23

同被引文献24

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部