期刊文献+

电液控制在煤矿综掘工作面滑移式临时支护中的应用 被引量:5

Application of Electro Hydraulic Control in Sliding Temporary Support of Fully Mechanized Excavation Face in Coal Mine
下载PDF
导出
摘要 临时支护的低效率严重影响准备巷道的快速掘进。在滑移式临时支护中应用电液控制技术和装置,改善了作业工艺,提高了临时支护的支护效率、支护质量和作业的安全性,提高了掘进进尺速度,为快速掘进创造了条件。 The low efficiency of temporary support affects the rapid excavation of preparation roadway.The application of electro hydraulic control technology and device in sliding temporary support has improved the operation technology, improved the support efficiency, support quality and operation safety of temporary support, increased the excavation footage speed and created conditions for rapid excavation.
作者 张鑫 孟俊文 Zhang Xin;Meng Junwen(Taiyuan Xiang Ming Intelligent Control Technology Co.,Ltd.,Taiyuan 030032,China;Xiegou Coal Mine,Shanxi Xishan Jinxing Energy Co.,Ltd.,Lvliang 033600,China)
出处 《煤矿机械》 2021年第4期147-148,共2页 Coal Mine Machinery
关键词 电液控制 综掘工作面 滑移式临时支护 进尺 electro hydraulic control fully mechanized excavation face sliding temporary support footage
  • 相关文献

参考文献5

二级参考文献4

共引文献45

同被引文献18

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部