摘要
东安湖体育公园三馆项目多功能体育馆预制清水混凝土看台板吊装施工中,结合已完工大型体育馆预制看台板安装经验,确保预制看台板在质量、工期、环保等方面的优势,并从深化设计、现场组织、多方案比选等方面入手,成功解决结构复杂、数量多、型号多、工期紧、交叉作业多等施工难题,顺利完成安装,安装精度及质量满足要求,看台板外观效果均达到优良标准。
In the hoisting construction of fair-faced concrete grandstand boards in the project of Dongan Lake Sports Park,the advantages of prefabricated grandstand boards in quality,time limit and environmental protection,etc.were analyzed through learning from and communicating with the large stadiums already constructed about their experience on the installation and construction of prefabricated grandstand boards.Such difficulties as complicated engineering structure,large quantity,multiple models,limited time,multiple cross-operating work,etc.were successfully solved through deepening concept design,field organization,choice and comparison of multiple solutions,etc.The specific installation work was completed smoothly,with both the installation precision and quality meeting the requirements,and the appearance of the grandstands meeting the quality standards.
作者
王晋
武雄飞
郭东亮
王光武
程建刚
艾维
李铉诚
袁贵福
袁问鑫
WANG Jin;WU Xiongfei;GUO Dongliang;WANG Guangwu;CHENG Jiangang;AI Wei;LI Xuancheng;YUAN Guifu;YUAN Wenxin(Southwest Branch,China Construction Third Engineering Bureau Group Co.,Ltd.,Chengdu,Sichuan 610041,China;Chengdu China Resources Land Yidu Real Estate Co.,Ltd.,Chengdu,Sichuan 610100,China)
出处
《施工技术》
CAS
2021年第6期55-57,共3页
Construction Technology
关键词
体育馆
吊装
看台板
清水混凝土
预制
安装
stadiums
hoists
grandstand boards
fair-faced concrete
prefabricated
installation