摘要
通过建立基于有限体积法的平面二维潮流数学模型,分析瓯江北口大桥建设前后的瓯江河口水位、流速、流场、纳潮量的变化,进而分析工程建设对瓯江河口防洪、航道和港区的影响。结果表明,平面二维潮流数学模型能够很好地模拟河口地区洪潮水演进过程,为河口地区的涉水工程建设提供技术支撑,具有较高的实用价值。
The 2D tidal flow mathematical model based on the finite volume method is established to analyze the:changes of water level,velocity,flow field and tidal prism in the Oujiang Estuary before and after the construction of Oujiang North Estuary Bridge,and then analyze the impact of the construction on the flood control,channel and port area of the Oujiang Estuary.The results show that the 2D tidal flow mathematical model can well simulate the:flood and tide evolution process in the estuary area,and provide technical support for the construction of water related projects in the estuary area,which has high practical value.
作者
倪春飞
张洪东
赵建锋
NI Chunfei;ZHANG Hongdong;ZHAO Jianfeng(PowerChina Huadong Engineering Corporation Limited,Hangzhou,Zhejiang,311122)
出处
《红水河》
2021年第2期15-20,共6页
Hongshui River
关键词
二维潮流数学模型
防洪评价
瓯江北口大桥
流场
纳潮量
分流比
2D tidal flow mathematical model
flood control evaluation
Oujiang North Estuary Bridge
flow field
tidal prism
split ratio