摘要 梯级水电站闸门开启后,泄洪流量存在不匹配的现象。为减少洪水调度过程中的闸门频繁启闭,通过统计清水河流域水库历史洪水退水过程,计算出退至某一流量后的洪水量,并结合水库的水位库容曲线,分析在该流量下关闸后库水位的变化情况,得出在入库流量退至特定范围内后再关闸,可有效减少闸门操作次数的结论。在流域综合特征没有较大变化的情况下,该结论对后续洪水调度有一定借鉴意义。 After the gate of cascade hydropower station is opened,there is a mismatch of flood discharge.In order to reduce the frequent opening and closing of the gate in the process of flood control,the flood volume after retreating to a certain flow is calculated by counting the historical flood recession process of the reservoir in the Qingshui River Basin.Combined with|the water level and capacity curve of the reservoir,the change of the reservoir water level after closing the gate'under the flow is analyzed.It is concluded that closing the gate after the inflow retreats to a specific range can effectively reduce the number of gate operations.In the case of no significant change in the comprehensive characteristics of the basin,this conclusion has a certain reference significance for the follow-up flood control.
作者 朱明星 ZHU Mingxing(Guizhou Wujiang Hydropower Development Co.,Ltd.,Guiyang,Guizhou,550002)
出处 《红水河》 2021年第2期31-34,共4页 Hongshui River
关键词 清水河流域 历史洪水 洪水调度 梯级水电站 Qingshui River Basin historical flood flood control hydropower station in cascade
  • 相关文献

参考文献4

二级参考文献10

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部