期刊文献+

东雷一级泵站水泵更新改造关键技术研究 被引量:3

Research on key technology of pump renovation and reconstruction of Donglei Stage Ⅰ Pumping Station
下载PDF
导出
摘要 东雷一期抽黄灌区东雷一级泵站为直接抽取黄河水进入总干渠灌溉的源头枢纽站,泵站特点为低扬程、大流量、扬程变幅较大、水源泥沙含量大。本文总结了两次水泵更新改造的成功经验、关键技术创新点及改造后的显著效果,可为解决多泥沙河流上的水泵运行效率低下、泥沙磨蚀严重、检修频繁的问题提供借鉴。 Donglei Stage Ⅰ Pumping Station in Donglei Phase Ⅰ Yellow River Pumping Irrigation Area is the source pumping station for directly pumping water from the Yellow River into the main canal for irrigation. The pumping station is characterized by low head, large flow, large head variation and high sediment content. The successful experience, key technical innovation points and remarkable results of twice pump renovations as well as the remarkable results after renovation are summarized in the paper. It provides reference for similar projects to solve the problems of low working efficiency, serious sediment abrasion, frequent maintenance, and even problems endangering the safe operation of the unit on muddy rivers.
作者 袁龙刚 YUAN Longgang(Zhongshan Water Conservancy and Hydropower Surveying,Designing and Consulting Co.,Ltd.,Zhongshan 528403,China)
出处 《水利建设与管理》 2021年第3期19-24,共6页 Water Conservancy Construction and Management
关键词 灌溉泵站 水泵改造 混流泵 轴流泵 泥沙 irrigation pumping station reconstruction of water pump mixed flow pump axial flow pump silt
  • 相关文献

参考文献9

二级参考文献5

共引文献16

同被引文献19

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部