3Roberts B B. The benefits of integrated, quantitative risk management [C]//The 12th Annual International Symposium of the International Council on Systems Engineering. Melbourne, Victoria: INCOSE, 2001.
4Garvey P R, Lansdowne Z F. Risk matrix: An approach for identifying, assessing, and ranking program risks [J]. Air Force Journal of Logistics, 1998, 22 (1) : 18-21.
5金培新.军事装备管理学[M].北京:军事科学出版社,2002:672-681.
6高崎.军械维修器材管理学[M].北京:国防工业出版社,2012:72-76.
7Cox Jr L A. What's wrong with risk matrix[J]. Risk Analysis,2008, 28(2): 497.
8Eskesen S D, Tengborg P, Kampmann J, et al. Guidelines for tunnelling risk management., international tunnelling association, working group No. 2 [J]. Tunnelling and Underground Space Technology, 2004, 19: 217.
9Aven T, Heide B. Reliability and validity of risk analysis[J]. Reliability Engineering and System Safety, 2009, 94.. 1862.
10Cox Jr L A, Babayev D, Huber W. Some limitations of qualitative risk rating systems [J]. Risk Analysis, 2005, 25 (3): 651.