珠三角地区某三旧改造地块已停产拆除,地块的未来利用规划属于一类用地。为了保障地块未来再开发利用的环境安全,对该地块开展了土壤和地下水污染状况调查研究。第一阶段的调查结果显示,地块存在工业生产活动,需进行第二阶段现场采样分析。采用判断布点和网格布点相结合的原则,在地块内共布设了33个土壤监测点位、11个地下水监测点位和1个对照监测点位。
A certain three-old reconstruction plot in the Pearl River Delta has been dismantled and demolished.The future use plan of the plot belongs to the first class of land.In order to ensure the environmental safety of future redevelopment and utilization of the plot,a survey and research on the soil and groundwater pollution status of the plot was carried out.The survey results of the first phase showed that there were industrial production activities on the plot,and the second phase of on-site sampling and analysis was required.Adopting the principle of combining judgment points and grid points,a total of 33 soil monitoring points,11 groundwater monitoring points and 1 control monitoring point were set up in the plot.
作者
袁响玲
卢伟
Yuan Xiangling;Lu Wei(Guangzhou Panyu Environmental Science Research Institute Co.,Ltd.,Guangzhou 510000,China;Guangzhou Investment Real Estate Co.,Ltd.,Guangzhou 510000,China)
出处
《皮革制作与环保科技》
2021年第5期96-97,共2页
Leather Manufacture and Environmental Technology
关键词
三旧改造地块
土壤污染状况调查
土壤污染
地下水污染
three old reconstruction plots
investigation of soil pollution status
soil pollution
groundwater pollution