本文借鉴中铁五局京沈6标二工区施工现场组织,就CRTSⅢ型板式无砟道床施工的质量控制要点、施工过程管理、现场物流组织进行阐述,以资类似工程参考。
This article draws on the construction site organization of the second work area of No.6 section of the China Railway Fifth Bureau Beijing-Shenyang Railway,and elaborates on the quality control points,construction process management,and on-site logistics organization of CRTSⅢtype slab ballastless bed construction to provide reference for similar projects.
作者
文武德
WEN Wu-de(China Railway 5th Bureau Group 2nd Engineering Co.,Ltd.,Hengyang 421000,China)
出处
《价值工程》
2021年第9期153-155,共3页