摘要
铁路隧道TBM施工及超长工区施工等补充预算定额的发布,填补了铁路隧道TBM法施工、巷道式通风、隧道智能养护、路基沥青混凝土防水封闭结构、预应力混凝土管桩等定额子目的空白,提高了现行铁路造价标准的适用范围,进一步完善了铁路造价标准体系,满足了铁路建设项目设计概预算编制和投资管理的需要。本文结合新发定额编制特点,对主要说明作出了详细注释说明,介绍了新发定额与现行定额的内在联系,着重对新发定额使用方法进行了阐述,以期对使用者有所帮助。
The issuance of supplementary budget norm and standard for TBM or super-long structure construction in railway tunnel fills up the blank of railway tunnel budget norm and standard by TBM construction,gallery ventilation,tunnel maintenance,waterproof and sealing structure of asphalt concrete,prestressed concrete pipe pile,etc.It improves the application scope of current railway cost standard,further improves the railway cost standard system,and meets the needs of railway construction project design budget preparation and investment management.Combined with the characteristics ofnewly issued norm and standard,this paper makes detailed notes on the’main description’section,introduces the internal relationship between the newly issued and the current norm and standard,and focuses on the notes on the key points of the newly issued norm and standard,so as to deepen the user’s understanding and to help the user.
作者
吴炜
唐小平
钟明琳
谢继昌
刘柏刚
WU Wei;TANG Xiao-ping;ZHONG Ming-lin;XIE Ji-chang;LIU Bai-gang(China Railway Economic and Planning Research Institute Co.,Ltd.,Beijing 100038,China)
出处
《铁路工程技术与经济》
2021年第2期1-5,共5页
Railway Engineering Technology and Economy
关键词
预算定额
TBM
超长工区
造价标准
特点
使用要点
budget norm and standard
TBM
super-long structure
cost standard
characteristic
application point