摘要
介绍了新疆JLTEJ水电站的主变A、B套保护装置技术改造换型工作,技术交底。
Introduced the technical transformation and remodeling work of the protective devices A and B of the main transformer of the Xinjiang JLTEJ Hydropower Station,and the technical details were explained.
出处
《电力系统装备》
2021年第4期13-14,共2页
Electric Power System Equipment
关键词
保护装置
技术改造
换型
protection device
technical transformation
changeover