摘要
目前,燃气-蒸汽联合循环机组是相对先进的发电技术,在当前能源结构改革的背景下,具有良好的发展前景。本文结合了390 MW燃气-蒸汽联合循环机组实际使用调试过程中出现的问题,分析了可能的原因并给出了相应的对策。
At present,gas steam combined cycle unit is a relatively advanced power generation technology,which has a good development prospect under the background of current energy structure reform.In this paper,combined with the problems of 390 MW gas steam combined cycle unit in the actual commissioning process,the possible causes are analyzed and the corresponding countermeasures are given.
作者
吴锐炎
谭勤学
Wu Rui-yan;Tan Qin-xue
出处
《电力系统装备》
2021年第4期147-148,共2页
Electric Power System Equipment