摘要
文章介绍了依托天津市大港港东新城污水处理厂项目高大模板的概况及做法,针对其施工难点探讨了施工工艺技术。该施工技术方案已顺利完成项目施工,可为今后相关工程项目提供参考。
The general situation and practice of high and large formwork based on Tianjin Dagang Gangdong New Town Sewage Treatment Plant Project is introduced in the paper.The construction technology is discussed in view of its construction difficulties.The construction technology scheme has successfully completed in the stage of the project construction,which can provide reference for related engineering projects in the project.
作者
王存臣
WANG Cunchen(China Railway 18 th Bureau Group Fifth Engineering Co.,Ltd.,Tianjin 300450,China)
出处
《中国水能及电气化》
2021年第4期12-16,共5页
China Water Power & Electrification
关键词
高大模板
施工技术
污水处理厂
high and large formwork
construction technology
sewage treatment plant